標題: Jerseys NFL Cheap GPL
無頭像
Fpblbt17

帖子 13351
註冊 2017-10-9
用戶註冊天數 2401
用戶失蹤天數 2105
狀態 離線
發表於 2018-3-10 20:52 
36.57.181.8
分享  私人訊息  頂部
More power outages are imminent as the Guyana Power and Light (GPL) is grappling to gain control of its generators,China Jerseys, which are problematic and have been collapsing recently.The constant power outages that are being experienced, are as a result of a number of the GPL units being problematic.Yesterday,NFL Jerseys China, Chairman of the GPL Board, Winston Brassington, told Kaieteur News that the problems being experienced at present are the worst the company has seen for the year.“It’s a combination of problems. One of our W?rtsil? machines is being overhauled and so we lost five and a half megawatts.”That unit, he noted, is scheduled to come back online later this week.Brassington added that for some months now, the units, one at Versailles and two Crossley plants at Garden of Eden, have not been working.The loss of those units represent a lost of 15 megawatts.“The problems will not be fixed overnight. Some parts have to be shipped overseas and so you are looking at a few months more.”But even as the power company seeks to battle with the constant problems of units, many of the 18 mobile caterpillar units are also problematic, Brassington said.“It is a pretty tight situation. And while it was expected to get better by the end of the week, we will not be out of the woods totally until the new 21 megawatts come on stream at the end of the third quarter of the year.”Recently,Cheap Adidas NHL Jerseys, Chief Executive Officer of GPL, Bharat Dindyal,Cheap Jerseys From China, has said that the frequent power outages experienced by consumers,Cheap Jerseys Wholesale, are likely to be significantly reduced shortly, with the acquisition of three new generators.The generators were acquired at the cost of US$30M through funding by PetroCaribe.He had said that his company’s current capacity is meeting the general demand of about 69 megahertz with no reserve.Dindyal claimed that with the arrival of the generators, the capacity will be significantly increased.However, despite this reassurance, consumers have been hard-hit with constant power outages over the past two weeks.According to the CEO, the generators are more efficient and will be more effective than those currently in use.He said that projections put commissioning of the engines at early September, at which time there should be power being put in the grid.Dindyal predicts that the generators will also reduce GPL’s production cost,Cheap NFL Jerseys China, through a reduced fuel import bill, since each engine generates more than seven megahertz of electricity.There are ten W?rtsil? engines in the current system operating at Kingston. The last engine was imported in 1997.