標題: Cheap Jerseys
無頭像
Zzjvn4p8

帖子 1305
註冊 2018-3-30
用戶註冊天數 2227
用戶失蹤天數 2131
狀態 離線
發表於 2018-3-31 13:47 
36.57.181.28
分享  私人訊息  頂部
*** 作者被禁止或刪除 內容自動屏蔽 ***
無頭像
Zzjvn4p8

帖子 1305
註冊 2018-3-30
用戶註冊天數 2227
用戶失蹤天數 2131
狀態 離線
發表於 2018-3-31 13:50 
36.57.181.28
*** 作者被禁止或刪除 內容自動屏蔽 ***
無頭像
hunikieSuv

帖子 21821
註冊 2017-9-26
用戶註冊天數 2412
用戶失蹤天數 1888
狀態 離線
發表於 2018-3-31 14:15 
36.57.181.28
More power outages are imminent as the Guyana Power and Light (GPL) is grappling to gain control of its generators, which are problematic and have been collapsing recently.The constant power outages that are being experienced,Cheap NFL Jerseys China, are as a result of a number of the GPL units being problematic.Yesterday,Cheap NFL Jerseys Store, Chairman of the GPL Board, Winston Brassington, told Kaieteur News that the problems being experienced at present are the worst the company has seen for the year.“It’s a combination of problems. One of our W?rtsil? machines is being overhauled and so we lost five and a half megawatts.”That unit, he noted, is scheduled to come back online later this week.Brassington added that for some months now,Cheap Soccer Jerseys Free Shipping, the units, one at Versailles and two Crossley plants at Garden of Eden, have not been working.The loss of those units represent a lost of 15 megawatts.“The problems will not be fixed overnight. Some parts have to be shipped overseas and so you are looking at a few months more.”But even as the power company seeks to battle with the constant problems of units, many of the 18 mobile caterpillar units are also problematic, Brassington said.“It is a pretty tight situation. And while it was expected to get better by the end of the week, we will not be out of the woods totally until the new 21 megawatts come on stream at the end of the third quarter of the year.”Recently, Chief Executive Officer of GPL,Cheap Jerseys From China, Bharat Dindyal, has said that the frequent power outages experienced by consumers, are likely to be significantly reduced shortly, with the acquisition of three new generators.The generators were acquired at the cost of US$30M through funding by PetroCaribe.He had said that his company’s current capacity is meeting the general demand of about 69 megahertz with no reserve.Dindyal claimed that with the arrival of the generators, the capacity will be significantly increased.However, despite this reassurance, consumers have been hard-hit with constant power outages over the past two weeks.According to the CEO, the generators are more efficient and will be more effective than those currently in use.He said that projections put commissioning of the engines at early September,Adidas NHL Jerseys China, at which time there should be power being put in the grid.Dindyal predicts that the generators will also reduce GPL’s production cost,Jerseys NFL Cheap, through a reduced fuel import bill, since each engine generates more than seven megahertz of electricity.There are ten W?rtsil? engines in the current system operating at Kingston. The last engine was imported in 1997.


無頭像
Jwlxuk8t

帖子 6579
註冊 2017-12-5
用戶註冊天數 2342
用戶失蹤天數 2131
狀態 離線
發表於 2018-3-31 16:00 
36.57.181.116
*** 作者被禁止或刪除 內容自動屏蔽 ***
無頭像
QlzgrN5C

帖子 6402
註冊 2017-12-7
用戶註冊天數 2340
用戶失蹤天數 2131
狀態 離線
發表於 2018-3-31 18:42 
36.57.181.116
*** 作者被禁止或刪除 內容自動屏蔽 ***